Finishing Works Contract template
نموذج عقد مقاولات تشطيب
An editable Saudi finishing works contract template for owners and contractors, covering the scope of finishing works, supply with or without materials, sample approval, payment instalments, delay penalties, final handover and warranty.
English translation for reference (machine-translated). The Word download and the version you sign are in Arabic.
Finishing Works Contract Template Compliant with the Laws of the Kingdom of Saudi Arabia
With the help and guidance of God, on this day __________, corresponding to / / AH, in the city of __________, it was agreed between: First Party (Employer): Mr __________, Saudi national, Civil Registry No. (__________) dated / / AH, address: city of __________, __________ District, __________ Street, Mobile (__________). Second Party (Contractor): __________ Contracting Establishment, Commercial Registration No. (__________) dated / / AH issued in __________, represented for signature by Mr __________, Mobile (__________). Preamble: Whereas the First Party owns the property located in the city of __________, __________ District, under title deed No. (__________) dated / / AH, has completed construction to shell (structural frame) level, and wishes to carry out the finishing works described in this contract and its annexes; and whereas the Second Party is a licensed establishment with sufficient experience; the two parties, having full legal capacity under Sharia and the law, have agreed as follows: Clause One: Preamble and Annexes The preamble, annexes, plans, bills of quantities and approved samples form an integral part of this contract. Clause Two: Scope of Finishing Works The Second Party undertakes to carry out the following finishing works in accordance with the specifications attached in Annex No. (1):| Item | Description of work | Specification / type | Approximate quantity | Included? |
|---|---|---|---|---|
| Plastering and rendering | .... | .... | .... m² | Yes / No |
| Tiling and marble | .... | .... | .... m² | Yes / No |
| Gypsum and ceilings | .... | .... | .... m² | Yes / No |
| Painting | .... | .... | .... m² | Yes / No |
| Electrical works | .... | .... | .... points | Yes / No |
| Plumbing and sanitary works | .... | .... | .... points | Yes / No |
| Doors and windows | .... | .... | .... units | Yes / No |
| Kitchens and cabinets | .... | .... | .... linear m | Yes / No |
| Air-conditioning works | .... | .... | .... units | Yes / No |
| .... | .... | .... | .... | Yes / No |
- Option One — finishing with materials: The Second Party undertakes to supply all necessary materials in accordance with the specifications and samples approved in Annex No. (1), and the contract value includes the cost of materials and labour.
- Option Two — finishing without materials (labour only): The First Party undertakes to supply the materials to the site on the agreed dates, and the Second Party's obligation is limited to execution and labour. The Second Party shall not be liable for delay resulting from late supply of materials by the First Party.
- Total contract value: (__________) Saudi riyals, inclusive/exclusive of value added tax (to be specified on signing).
- Advance payment on signing: (__________) Saudi riyals, representing (____%).
- Interim payments according to actual completion percentages, released after inspection and approval by the First Party or his technical representative.
- A final payment of (____%) released after final handover and resolution of the snagging items.
- Obligations of the Second Party (Contractor):
- To execute the works in accordance with the approved specifications and samples and good workmanship.
- To provide trained labour and the necessary equipment, and to bear responsibility for their safety and the regularity of their iqamas.
- To protect the parts of the property not covered by the contract, and to repair at its own expense any damage it causes to them.
- To remove debris and clean the site on an ongoing basis and at final handover.
- Obligations of the First Party (Employer):
- To hand over the site on the agreed date, and to provide the electricity and water needed for execution.
- To approve samples and release payments on time.
- This contract is governed by the laws of the Kingdom of Saudi Arabia, in particular the Civil Transactions Law.
- Disputes shall be settled amicably; failing that, they shall be referred to the competent judicial authority.
- All written correspondence and documented messages form part of this contract.
- This contract is executed in two signed copies, one held by each party to act upon.
Note: Renovation Contracts
If the required works are a renovation of an existing property rather than finishing a new shell, the same template may be used, taking the following into account: add a clause for inspecting the existing condition and documenting it with photographs before starting; specify whether the works include treating structural damage (works that may require an engineering report); and set out each party's responsibility for hidden defects that appear after the old finishes are removed.Need your finishing works contract reviewed before signing?
Contact a lawyer or law firm in your city directly through the KSA Lawyers directory.
Lawyers in Riyadh Lawyers in Jeddah Lawyers in Makkah Lawyers in Madinah Lawyers in Dammam Lawyers in Khobar
Need a lawyer to review this contract?
Contact a licensed lawyer in your city to tailor the wording to your situation before you sign.
This template is for general guidance only and isn't legal advice. The right wording depends on each case. Contracts filed with Saudi courts or platforms are normally in Arabic.